Lmente

Lmente

From an ambitious brief to a focused mobile launch

From an ambitious brief to a focused mobile launch

From an ambitious brief to a focused mobile launch

Product design for a shared-activities platform, from shaping the first release with the client to supporting implementation and launch

Across six months and several releases, I worked on experiments to improve what candidates saw and could do after applying

Lmente · Product design + research · 2024–2026

Lmente · Product design + research · 2024–2026

Lmente · Product design + research · 2024–2026

Role

Role

Product Designer

Product Designer

Scope

Scope

Interaction concepts, product improvements, UI explorations

Interaction concepts, product improvements, UI explorations

Formats

Formats

Prototypes, shipped features and speculative concepts

Prototypes, shipped features and speculative concepts

Surfaces

Surfaces

iOS, web, system UI

iOS, web, system UI

Period

Period

2024–2026

2024–2026

Reconstruction note

Reconstruction note

This case study is a portfolio reconstruction. All financial and commercial details are illustrative. I replaced or substantially changed the benefits, prices, values, membership names, eligibility rules and product language from the original work.

This case study is a portfolio reconstruction. All financial and commercial details are illustrative. I replaced or substantially changed the benefits, prices, values, membership names, eligibility rules and product language from the original work.

It shows the problem, what I changed and why.

It shows the problem, what I changed and why.

The brief started with the concepts. Before designing them, I checked whether the planned research could answer the questions behind them. I reworked the study with Compliance and product partners, then designed concepts the team could test. I left while we were still planning the research and working on those concepts.

The brief started with the concepts. Before designing them, I checked whether the planned research could answer the questions behind them. I reworked the study with Compliance and product partners, then designed concepts the team could test. I left while we were still planning the research and working on those concepts.

 

03:00 PM

THE PROBLEM WITH REWARDS

THE PROBLEM WITH REWARDS

Too little goes unnoticed. Too much costs a fortune

Too little goes unnoticed. Too much costs a fortune

Lmente

Basics

Route

Group

Review

Click and drag to draw

© Mapbox © OpenStreetMap

Two people walking beside a lake

Hiking

Saturday

10:30

Lakeside Walk from Lubiatowo to Dzierżęcino

Shape the route

Draw a route on the map to see its stops and endpoints.

Distance

Total time

Elevation gain

Basics

Group

Lmente

Basics

Route

Group

Review

Click and drag to draw

© Mapbox © OpenStreetMap

Two people walking beside a lake

Hiking

Saturday

10:30

Lakeside Walk from Lubiatowo to Dzierżęcino

Shape the route

Draw a route on the map to see its stops and endpoints.

Distance

Total time

Elevation gain

Basics

Group

Lmente

Discover

My Events

Chats

Basics

Route

Group

Review

Click and drag to draw

© Mapbox © OpenStreetMap

Two people walking beside a lake

Hiking

Saturday, 10:30

Lakeside Walk from Lubiatowo to Dzierżęcino

Shape the route

Draw a route on the map to see its stops and endpoints.

Distance

Total time

Elevation gain

Basics

Group

Lmente

Discover

My Events

Chats

Basics

Route

Group

Review

Click and drag to draw

© Mapbox © OpenStreetMap

Two people walking beside a lake

Hiking

Saturday, 10:30

Lakeside Walk from Lubiatowo to Dzierżęcino

Shape the route

Draw a route on the map to see its stops and endpoints.

Distance

Total time

Elevation gain

Basics

Group

Lmente

Discover

My Events

Chats

Basics

Route

Group

Review

Two people walking beside a lake

Hiking

Saturday, 10:30

Anyone up for a walk to the lighthouse?

Shape the route

Draw a route on the map to see its stops and endpoints.

Distance

Total time

Elevation gain

Basics

Group

Click and drag to draw

© Mapbox © OpenStreetMap

Hiking

Sat

14:00

8 km away

Anyone up for a walk to the lighthouse?

5 spots available

Marta is organizing

Games

Sat

10:30

6 km away

We’ve got the games. We need two more players

2 spots available

3

+

5 people joined

Ride

Today

9:00

4 km away

Easy coastal ride with time to enjoy the views

12 spots available

F

Ola + 2 friends

Within 5 km

3 days

Discover

My Events

Chats

3 plans nearby

Sort: Nearest

Ride

Today

9:00

4 km away

Easy coastal ride with time to enjoy the views

12 spots available

F

Ola + 2 friends

Games

Sat

10:30

6 km away

We’ve got the games. We need two more players

2 spots available

3

+

5 people joined

Hiking

Sat

14:00

8 km away

Anyone up for a walk to the lighthouse?

5 spots available

Marta is organizing

List view

Cycling

Today

09:00

Board games

Sat

10:30

Hiking

Sat

14:00

Hiking

Sat

14:00

8 km away

Anyone up for a walk to the lighthouse?

5 spots available

Marta is organizing

Games

Sat

10:30

6 km away

We’ve got the games. We need two more players

2 spots available

3

+

5 people joined

Ride

Today

9:00

4 km away

Easy coastal ride with time to enjoy the views

12 spots available

F

Ola + 2 friends

Within 5 km

3 days

Discover

My Events

Chats

3 plans nearby

Sort: Nearest

Ride

Today

9:00

4 km away

Easy coastal ride with time to enjoy the views

12 spots available

F

Ola + 2 friends

Games

Sat

10:30

6 km away

We’ve got the games. We need two more players

2 spots available

3

+

5 people joined

Hiking

Sat

14:00

8 km away

Anyone up for a walk to the lighthouse?

5 spots available

Marta is organizing

List view

Cycling

Today

09:00

Board games

Sat

10:30

Hiking

Sat

14:00

Lmente

Discover

My Events

Chats

All

Cycling

Hiking

Running

Climbing

Swimming

Board games

More

3 plans nearby

Sort: Nearest

Up to 20 km away

Next 7 days

Cycling

Today

09:00

4 km away

Easy coastal ride with time to enjoy the views

18 km

2 h

Easy pace

12 spots available

F

Ola + 2 friends

Board games

Sat

10:30

6 km away

We’ve got the games. We need two more players

Various games

2 h

All levels

2 spots available

3

+

5 people joined

Hiking

Sat

14:00

8 km away

Anyone up for a walk to the lighthouse?

7 km

1.5 h

Easy trail

5 spots available

Marta is organizing

Cycling

Today

09:00

Board games

Sat

10:30

Surface

Mostly paved

Distance

18 km

Pace

14-16 km/h

Details

Route

Point-to-point

Climb

+85 m

Off-road

82%

Details

Start

Sat

14:00

Stop

km 5

10 min

Finish

Around 15:30

Start

In 2h 18 min

Stop

km 8

10 min

Scenic stop

km 14

20 min

Finish

Around 11:00

Venue

Host’s home

Location

Approximate

Exact address

After approval

Details

Hiking

Sat

14:00

All events

Why didn’t we prioritise the tracker?

Why didn’t we prioritise the tracker?

Prioritising the tracker would have meant committing to the solution with the biggest data and integration gaps. I preferred to split the problem into smaller hypotheses that we could test independently.

Prioritising the tracker would have meant committing to the solution with the biggest data and integration gaps. I preferred to split the problem into smaller hypotheses that we could test independently.

Tracking could still be developed later, as Stepstone’s application flows and data coverage improved.

Tracking could still be developed later, as Stepstone’s application flows and data coverage improved.

What changed beyond the screen?

What changed beyond the screen?

Before this project, the post-application screen was mostly treated as the end of the application flow. We shipped and tested three improvements and left the team with a clearer set of questions for the work that remained.

Before this project, the post-application screen was mostly treated as the end of the application flow. We shipped and tested three improvements and left the team with a clearer set of questions for the work that remained.